![]() | Formwork Making - Course: Timberwork techniques. Instruction examples for practical vocational training (Institut für Berufliche Entwicklung, 23 p.) |
Institut fufliche Entwicklung e.
V.
Berlin
Original title:
Lehrbeispiele f berufspraktische Ausbildung
"Herstellen
von Schalungen"
Author: Peter Wehrmann
First edition © IBE
Institut fufliche Entwicklung e.V.
Parkstra
23
13187 Berlin
Order No.: 93-33-3601/2
The present booklet contains 5 selected instruction examples to practise making of different types of form-work.
The first example serves for practising the prefabrication of formwork panels.
Prefabricated formwork panels are indispensable for beam and column formworks. Prefabricated formwork panels, however, are also recommended for series production of foundation and ceiling formworks.
In that case the construction of the panels differs from that of panels for beam and column formworks but the technology of prefabrication is the same.
The construction of a multi-use formwork panel for beam and column formwork is explained and shown in the Trainees' Handbook of Lessons.
Thus example 1.1. represents direct or possible preparations for the other four examples and, therefore, there is a close technological connexion between them. The examples 1.2. to 1.5. explain how to produce the four most common types of formwork.
The required materials, tools and auxiliary accessories are specified for each example.
Moreover, the necessary previous knowledge is stated which is the basis for independent practising by the trainee.
The order of working steps of the relevant sequence of operations for the individual examples has been established by experience. If it is strictly followed, no faults would normally occur.
The examples selected can be modified to suit the relevant site conditions. Specific modifications ordered, however, may require changes to the sequence of operations.
This example serves for practising the prefabrication of formwork panels for beam and column formworks, in particular the prefabrication of a bottom panel for beam formwork.
Material
Formwork boards - 25 mm thick
nails - 40 mm and 70 mm long
Figure
Hand tools and machines
Circular saw, hand saw, hammer, wrecking bar with claw
Measuring and testing means
Folding rule, try square, measuring rods
Auxiliary accessories
Pencil, paper
Necessary previous knowledge
Handling of length measuring tools, scribing, working with the circular saw and manual sawing
Explanations to the working drawing
1 formwork bottom, 2 cover strap projection, 3 sheeting thickness, 4 cover strap thickness 25 mm, 5 thrust-board width 100 mm
Sequence of operations |
Comments |
1. Prepare the work. |
Make available the tools and materials. A work table is to be manufactured (See Fig. 10 in the Trainees' Handbook). |
2. Enter all sizes required into the working drawing. |
Derive the sizes from the dimensions of the beam for which the formwork is to be made. Prepare the size distribution of the cover straps in particular. |
3. Cut up the boards. |
The board width should not exceeded 140 mm. Do not place the rough edge of the board to the inside of the formwork! |
4. Cut the stiffening cover straps to length. |
Cover straps to have a width of approx. 55 mm with 25 mm projection for comer joints! |
5. Put the cover straps on the arranged boards according to the size distribution made. |
Use measuring rod, if necessary! |
6. Nail the cover straps on the board-panel. |
It is provisional nailing with short nails (40 mm). Use as many nails as necessary to make the panel stable in itself. |
7. Nail the cover straps on the boards from the opposite side. |
Turn over the provisionally nailed board-panel and nail it with 70 mm long nails. Two nails per board are to be diagonally arranged at the cover strap joint! |
8. Clinch the nail tips. |
Turn over the panel again and clinch the penetrated nail tips! |
Prefabrication of Formwork
Panels
This example serves to practise making of a ceiling formwork in a room of given dimensions.
Material
Formwork boards 25 mm thick
squared timbers 120 mm x 100
mm
round timbers of 150 mm diameter
various wooden wedges
nails of
different sizes
Figure
Hand tools and machines
Circular saw, hand saw, hammer, wrecking bar with claw, nail pincers
Measuring and testing means
Folding rule, try square, water level, measuring rod
Auxiliary accessories
Paper, pencil
Necessary previous knowledge
Manual sawing, working with the circular saw, measuring , scribing, nailing, sketching
Explanations to the working drawing
1 walling, 2 trestle timber, 3 formwork bearer, 4 sheeting boards, 5 diagonal (cross) bracing
Sequence of operations |
Comments |
1. Study the formwork project and/or prepare a formwork sketch. |
Dimensions in the instruction example are guidelines only! |
2. Make available the required tools and materials. |
Use sharpened sawing tools only! |
3. Determine the column height and cut up the column. |
Six columns are to be produced; the height depends on the height of the room (see Trainees' Handbook)! Cleats for fixing are to be provided at the sides of the columns! |
4. Cut the trestle timbers to length. |
For an assumed narrow side of the room of 3.5 m three trestle timbers are to be produced! |
5. Fix the trestle timbers, cut up and nail diagonal bracing and erect the trestle. |
Fix the trestle timbers through the cleats to the columns. Lean the right and left trestles and one side of the centre trestle against the wall! The trestles are to be put to the floor for nailing. |
6. Secure the trestles provisionally. |
Erect the trestles and drive wedges between the wall and end face of the trestle timbers. 3 persons are required for this work! |
7. Level the trestles. |
Use water level and levelling board for levelling. Adjust the height of the columns by means of packing wedges. Columns must be exactly perpendicular. |
8. Fix the formwork bearers on the trestles. |
Cut formwork bearers to length and put them on the trestles at certain intervals (60 to 70 cm). Ensure parallelism! Use nail pins for fixing. |
9. Nail on the sheeting boards. |
Cut sheeting boards to length and nail them onto formwork bearers. In view of later stripping, do not use nails which are longer than 50 mm! |
10. Check the formwork for accuracy to size and for strength. |
Make corrections in case of deviations. For bigger rooms place more columns under the trestles. |
Ceiling Formwork
Making
This example serves to practise making of a strip foundation formwork to given dimensions of a drawing (without lateral border).
Material
Formwork boards
square timbers
nails of different
sizes
tie wire
steel nails
Figure
Hand tools and machines
Circular saw, hand saw, hammer, wrecking bar with claw, nail pincers, bit, bit brace
Measuring and testing means
Folding rule, try square, water level, measuring rods
Auxiliary accessories
Paper, pencil, line
Necessary previous knowledge
Handling of length measuring tools, scribing, manual sawing and working with the circular saw
Explanations to the working drawing
1 stull, 2 formwork sheeting, 3 post, 4 waler, 5 width of foundation, 6 steel rod for tieing of the tie wire, 7 tie wire
Sequence of operations |
Comments |
1. Study the formwork project. |
Under the strip foundation to be erected there must be a horizontal layer of concrete (approx. 100 mm)! |
2. Stretch the alignment lines. |
The upper edges of the foundation determine the points of alignment of the lines. Use line supports or other measuring point aids! |
3. Nail a formwork bottom board onto the foundation. |
Nail on the formwork bottom board with steel nails exactly in alignment. |
4. Erect the vertical post timbers |
After erection of the post timbers fix them with nail pins. On top the post timbers are to be stabilize by stulls to be nailed on! |
5. Fixing of the sheeting boards to the post timbers by nailing. |
Start nailing from the bottom! |
6. Fixing of horizontal walers (both sides) to the post timbers by nail pins. |
The distance of the walers from the formwork bottom boards depends on the height of the foundation and is approximately 1000 mm. |
7. Place steel reinforcement, if provided for. | |
8. Nail stulls on top of the side walls near the places of tieing (by tie wire). |
The stulls must only slightly project over the formwork sheeting! |
9. Tie the formwork from waler to waler at distances of 600 mm by means of tie wire. |
Wire to be guided through previously bored holes in the formwork sheeting (see working drawing). |
10. Check the whole formwork again for alignment and accuracy to size and stabilize it laterally by diagonal bracing to the subsoil. |
Make corrections in case of dimensional deviations! |
Strip Foundation Formwork
Making
This example serves to practise making of a beam formwork for a brickwork wall coping to given sizes.
Material
Formwork boards
squared timbers
nails of different
sizes
tie wire
Figure
Hand tools and machines
Circular saw, hand saw, hammer, wrecking bar with claw, nail pincers, bit, bit brace
Measuring and testing means
Folding rule, try square, water level, measuring rods
Auxiliary accessories
Paper, pencil
Necessary previous knowledge
See ceiling formwork
Explanations to the working drawing
1 brickwork, 2 brickwork support, 3 stull, 4 formwork side panel, 5 cover straps, 6 waler, 7 formwork bottom panel
Sequence of operations |
Comments |
1. Study the formwork project. Prepare the work. |
Make available the tools and materials. |
2. Make two trestles (columns connected with trestle timber through cleats) for the longitudinal front of the wall. |
Dimension the height of the columns so as to allow for two packing wedges, the formwork sheeting (sheeting boards)! |
3. Erect the trestles and secure them laterally by wedges. |
Trestles to stand exactly at the outside wall lines! |
4. Nail on two board-connectors at the left and right of the beam wall support. |
The 200 mm distance to the wall must correspond with the cover strap dimensions. Upper edge of formwork sheeting is equal to lower edge of beam! |
5. Fix the diagonal bracings to the columns. |
Nail bracings longitudinally and transversely to the wall! |
6. Make the formwork bottom (See instruction example 1.1.): |
Do not cut the cover straps flush but make allowance at both sides at least for formwork sheeting thickness, cover strap thickness and thrust-board width! |
7. Put the prefabricated side panels on the cover strap projection at the left and right sides and connect them with stulls on the upper edges. |
According to the brickwork support openings of the beam, the length of the side panels is to be dimensioned so as to permit that the supports are enclosed by the formwork at both sides! |
8. Nail on a thrust-board at the lateral foot of the formwork panels. |
Nail on from both sides! |
9. Fix walers at the sides of formwork panels (upper end). |
Fix walers laterally with nail pins! |
10. Tie the formwork with tie wire at the walers. |
The walers must also cover the brickwork support openings. The tie-wire tieing is to be provided immediately near the stulls! |
11. Check the formwork again for alignment and accuracy to size. |
Make corrections, if necessary. |
Beam Formwork
Making
This example serves to practise making of a column formwork to given sizes.
Material
Formwork boards
squared timbers
nails of different sizes
Figure
Hand tools and machines
Circular saw, hand saw, hammer wrecking bar with claw, nail pincers, column clamps of steel with steel wedges
Measuring and testing means
Folding rule, try square, water level, plump
Auxiliary accessories
Paper, pencil
Necessary previous knowledge
See ceiling form work
Explanations to the working drawing
1 arch timber, 2 formwork sheeting, 3 steel clamps, 4 steel wedge, 5 cover straps of formwork sheeting panel, 6 foot rim, 7 nailing, 8 steel nails
Sequence of operations |
Comments |
1. Study the formwork project. |
Make available the tools and materials. |
2. Scribe the size of the column on the concrete bottom. |
If steel reinforcements project from the concrete bottom, they are to be connected with the column reinforcement! |
3. Nail the column rim on the concrete. |
The inside dimensions of the column rim must allow for 25 mm sheeting thickness per side. The column rim is to be prefabricated from boards! |
4. Erect one column comer. |
Alternately insert two prefabricated panels in the column rim to form a comer and nail them together. If necessary, support them diagonally by boards! |
5. Place the reinforcing steel. | |
6. Erect the second column comer. |
Insert the remaining two panels in the column rim and nail them alternately! One panel must have a cleaning hole at the foot! |
7. Erect the arch timbers. |
Erect and fix with nails two arch timbers (100 mm x 100 mm) at both sides of each corner! Make sure that the column formwork is perpendicular! |
8. Tie the column formwork. |
Wrap column clamps of flat steel around the arch timbers and tighten them with steel wedges. The vertical distance between the column clamps should be approximately 700 mm. If no steel clamps are available, use wooden rims! |
9. Check the alignment and accuracy to size. | |
Column Formwork
Making