![]() | Operation and Maintenance of Water and Sewerage Systems (Ministry of Water - Tanzania - Rwegarulila Water Resources Institute, 1999, 90 p.) |
![]() | ![]() | (introduction...) |
![]() | ![]() | A. Maintenance of Water Supply Units Principles and General Procedures |
![]() | ![]() | 1. Introduction |
![]() | ![]() | 2. Operation and maintenance |
![]() | ![]() | 3. Inspections |
![]() | ![]() | 4. Inspections made before putting the unit into operation for first time |
![]() | ![]() | 5. Periodic inspections made normally without interrupting the operation |
![]() | ![]() | 6. Periodic inspections made by interrupting the operations |
![]() | ![]() | 7. Remedial measures |
![]() | ![]() | 8. Records |
![]() | ![]() | 9. Maintenance programmes |
![]() | ![]() | B. Operation and Maintenance in Tanzania |
![]() | ![]() | 1. What is operation and maintenance |
![]() | ![]() | 2. Constraints of operation and maintenance |
![]() | ![]() | 3. Strategies for operation and maintenance on sustainable basis |
![]() | ![]() | 4. Operational problems |
![]() | ![]() | C. General Guide Lines in Construction of Water Structure |
![]() | ![]() | 1. Intake structures |
![]() | ![]() | 2. Pumping stations |
![]() | ![]() | 3. Rising main |
![]() | ![]() | 4. Water treatment |
![]() | ![]() | 5. Gravity main |
![]() | ![]() | 6. Water tanks |
![]() | ![]() | 7. Distribution system |
![]() | ![]() | 8. The design of the sewerage system |
![]() | ![]() | D. Operation and Maintenance Tasks and Their Frequencies |
![]() | ![]() | 1. Water Supply |
![]() | ![]() | 2. Sanitation |
![]() | ![]() | ANNEXES |
![]() | ![]() | 1. Class Test (in Swahili) |
![]() | ![]() | 2. Evaluation Form (in Swahili) |
![]() | ![]() | 3. Group work - Operation and Maintenance of the following: |
![]() | ![]() | - Intake structure |
![]() | ![]() | - Pumping station |
![]() | ![]() | - Water treatment unit |
![]() | ![]() | - Water mains |
![]() | ![]() | - Water tanks |
![]() | ![]() | - Sewerage systems |