1 Project description

As a basis for initial environmental assessment, a description of the project or activities must be available. In most cases it will be relevant to present several alternative technical solutions and localities. Activities in both the constructional phase and the operational phase of the project must be included.

This description will to a certain extent be based on the regular technical and economic documentation of the project, possibly after consultations with project planners or other relevant institutions. The following questions aim to elicit information that is relevant with regard to environmental impacts. Relatively detailed information may be required with regard to production processes, use of inputs, localisation etc.. The information resulting from the initial assessment can be included in the regular project document being presented for approval. In the case of more comprehensive projects, the information may be collected in an appendix to this document. The following specifies essential background information for an initial assessment:

a. The need for the project. Give a brief description of how the need for the project has arisen. What are the purposes of the project? To what extent will the project cover local needs or contribute to local development? Which other activities, for instance industrial development, are expected as a consequence of the project?

b. Alternatives considered. Give a brief presentation of the most important technology and localisation alternatives which have been considered in connection with the project. If possible, give a brief account of any differences in technology, need for energy, labour requirements etc. The 0-alternative, that is the impacts of not implementing the project, may also be relevant to consider.

c. Description of the project and potential main alternatives. Give a relatively comprehensive description of the alternative(s) that are viewed as relevant. The description should include map references of facilities, areas directly utilised, what types of areas these are, design alternatives, relevant mitigative measures, future expansion needs, sources of sand and gravel, transport requirements, labour requirements, and the impacts on existing or planned activities in the area.

d. Conditions for project implementation. Give an account of the public and private physical initiatives (housing construction etc.) and any other external prerequisites for the implementation of the project, e.g. participation of the local population, training opportunities, maintenance routines, and local institutional and administrative conditions, including their environmental competence. In addition local, national and international environmental regulations/requirements should be known and complied with by all parties.