Cover Image
close this book A training manual in conducting a workshop in the design, construction, operation, maintenance and repair of hydrams
close this folder Attachments
View the document Attachment 1-A
View the document Attachment 1-B
View the document Attachment 2-A
View the document Attachment 2-B
View the document Attachment 2-C
View the document Attachment 2-D
View the document Attachment 2-E
View the document Attachment 3-A
View the document Attachment 3-B
View the document Attachment 3-C
View the document Attachment 3-C - metric
View the document Attachment 3-D
View the document Attachment 4-A
View the document Attachment 4-B
View the document Attachment 4-C
View the document Attachment 4-D
View the document Attachment 5-A
View the document Attachment 5-B
View the document Attachment 6-A
View the document Attachment 6-B
View the document Attachment 2-B
View the document Attachment 7-A
View the document Attachment 8-A
View the document Attachment 8-B
View the document Attachment 8-C
View the document Attachment 10-B
View the document Attachment 10B - metric
View the document Attachment 10-C
View the document Attachment 10-C - metric
View the document Attachment 10-D
View the document Attachment 10-D - metric
View the document Attachment 10-E
View the document Attachment 10-E - metric
View the document Attachment 10-F
View the document Attachment 10-F - metric
View the document Attachment 9-A-1
View the document Attachment 9-A-2
View the document Attachment 9-A-3
View the document Attachment 9-A-4
View the document Attachment 9-A-5
View the document Attachment 9-A-7
View the document Attachment 10-A
View the document Attachment 10-H
View the document Attachment 10-I
View the document Attachment 10-J
View the document Attachment 10-L
View the document Attachment 10-M
View the document Attachment 10-N
View the document Attachment 11-A
View the document Attachment 11-B
View the document Attachment 11-C
View the document Attachment 12-A
View the document Attachment 13-A
View the document Attachment 13-B
View the document Attachment 13-C
View the document Attachment 14-A
View the document Attachment 14-B
View the document Attachment 14-C
View the document Attachment 15-A
View the document Attachment 16-A
View the document Attachment 16-B
View the document Attachment 16-C
View the document Attachment 16-D
View the document Attachment 17-A
View the document Attachment 17-B
View the document Attachment 17-C
View the document Attachment 17-D
View the document Attachment 17-E
View the document Attachment 18-A
View the document Attachment 18-B
View the document Attachment - Glossary of terms
View the document Attachment - English-metric units conversion table

Attachment 10-A

Session 10, Handout 10A

Concrete hydram design parameters

CAVITY WALL THICKNESS

DOME COVER THICKNESS

NUMBER OF BOLTS AND SIZE

The side wall thickness (Ts) in a concrete Hydram without reinforcement shall be equal to the diameter of the cavity (Dc) in inches times the drive head (H) in feet divided by 10 or shall be equal to the cavity diameter, whichever is greater.

The top or bottom wall thickness (TL) should be 1.25 times the cavity diameter.


Concrete hydram design parameters

The total bolt area (TBA) should equal the drive pipe diameter (inches) squared times the drive head in feet divided by 50 or :




If D in mm. and H in meters then




To determine the proper number of bolts, find the area of the bolt size you wish to use and divide it into the total bolt area.

Diameter of bolt:

mm.

6.3

8

9.5

11

12.7

14 2

15.8

19.

22.2

25.4

in.

1/4

5/16

3/8

7/16

1/2

9/16

5/8

3/4

7/8

1

Area of bolt:

.027

.045

.068

.093

.126

.162

.202

.302

.419

.551