![]() | ![]() | Part 2 - Actions to reduce risk |
![]() |
|
This part of the module illustrates the difference between passive and active methods of risk reduction as well as five basic types of measures available for use in planning mitigation programs:
Engineering and construction measures
Physical planning measures
Economic measures
Management and institutional measures
Societal measures