![]() | Wells Construction: Hand Dug and Hand Drilled (Peace Corps, 1980, 282 p.) |
![]() | ![]() | (introduction...) |
![]() | ![]() | Acknowledgments |
![]() | ![]() | Introduction |
![]() | ![]() | Section one: Planning |
![]() | ![]() | Chapter 1: Introduction to wells planning |
![]() | ![]() | A. Overview |
![]() | ![]() | B. The need for adequate water supply |
![]() | ![]() | C. Involving the local community |
![]() | ![]() | D. Selecting the most appropriate water source |
![]() | ![]() | E. Site choice |
![]() | ![]() | F. Preventing water contamination |
![]() | ![]() | G. Types of wells |
![]() | ![]() | H. Well sections |
![]() | ![]() | I. Materials |
![]() | ![]() | J. Tools and equipment |
![]() | ![]() | K. Sinking method |
![]() | ![]() | L. Preparation for construction |
![]() | ![]() | M. Planning |
![]() | ![]() | Section two: Hand dug wells |
![]() | ![]() | Chapter 2: Introduction to hand-dug wells |
![]() | ![]() | Chapter 3: Well design |
![]() | ![]() | Chapter 4: Supplies |
![]() | ![]() | Chapter 5: Lowering and raising workers and equipment |
![]() | ![]() | Chapter 6: Digging |
![]() | ![]() | Chapter 7: The middle section: overview of lining techniques |
![]() | ![]() | Chapter 8: Construction of the middle section |
![]() | ![]() | Chapter 9: Construction of the bottom section |
![]() | ![]() | Section three: Drilled wells |
![]() | ![]() | Chapter 10: Introduction to drilled wells |
![]() | ![]() | Chapter 11: Drilling and casing techniques |
![]() | ![]() | Chapter 12: Construction: hand rotary and hand percussion methods |
![]() | ![]() | Chapter 13: Construction: sludger method |
![]() | ![]() | Chapter 14: Construction: driven and jetted |
![]() | ![]() | Chapter 15: The bottom section |
![]() | ![]() | Appendices |
![]() | ![]() | Appendix I: Conversion factors and tables |
![]() | ![]() | Appendix II: Vegetation as an index of ground water |
![]() | ![]() | Appendix III: Uses of dynamite in hand dug wells |
![]() | ![]() | Appendix IV: Cement |
![]() | ![]() | Appendix V: Leveling and plumbing the mold |
![]() | ![]() | Appendix VI: Pipe |
![]() | ![]() | Appendix VII: Pumps |
![]() | ![]() | Appendix VIII: Water treatment in wells |
![]() | ![]() | Appendix IX: Rope strength |
![]() | ![]() | Glossary |
![]() | ![]() | Annotated bibliography |
Peace Corps
INFORMATION COLLECTION & EXCHANGE
Manual M0009
Written by
Richard E. Brush
Illustrated by
Laura K. Gould
Edited by
Eugene Eccli
Sandy Eccli
David
Tyler